INFRASTRUCTURE // CHANGE CONTROL
INFRASTRUCTURE DELIVERED. OPERATIONS PROTECTED.
Retail IT infrastructure, network design, and store buildouts for live environments.
We design, deploy, and own the technical foundation for retail and hospitality environments.
We eliminate the failure modes that break launches in live operations.
THE REALITY OF CHANGE
Infrastructure changes are not “growth opportunities.”
They are risk events.
Without a single point of ownership, infrastructure fails silently until launch day.
Svolta IT assumes total ownership of the result.
We manage vendors, conflicts, and dependencies so operations don’t absorb the risk.
THE THREE PILLARS OF CONTROLLED CHANGE
Where responsibility is owned.
01 // BUILD
Store & Venue Buildouts
We own the site until ready.
— Vendor coordination
— Structured cabling oversight
— POS hardware integration
— ISP delivery and activation
02 // CONNECT
Network & Wi-Fi Engineering
We own performance under load.
— Wi-Fi 6 / 7 deployments
— VLAN segmentation
— Firewall hardening
— Production signal heatmaps
03 // TRANSITION
Change-Controlled Migrations
We own rollback, not just execution.
— Microsoft 365 & Google Workspace migrations
— Server-to-Cloud transitions
— Security stack deployment
— Tested rollback protocols
EXECUTION MODEL
How infrastructure is actually built.
Infrastructure failures don’t come from technology.
They come from missing ownership during execution.
01 — Site intake & floor planning:
Operational requirements + AP placement defined
02 — Network & cabling design:
Topology, VLANs, and signal mapping
03 — On-site deployment & vendor coordination:
Electrical, ISP, rack, and AP installs managed
04 — Validation, failover testing, and production:
Load testing and live transaction verification
sign-off
THE SVOLTA STANDARDS
Operational non-negotiables.
STANDARD I
Redundancy by Design
If a primary ISP fails, the POS must stay up.
No exceptions.
STANDARD II
Vendor Accountability
We are the single point of contact.
We don’t let vendors blame each other.
We resolve the conflict and deliver the outcome.
STANDARD III
Binary Completion
The project isn’t “done” until the first transaction
is successfully processed in a live environment.